Prototype. Brand name, products, prices and lead times are sample data.
Start a Project

Customization

Custom product development

When a catalog item is not enough: a pin, keychain or molded piece cut from your design, or a bag or notebook built to your pattern. A mold is made once and kept on file, so the shape reorders like any catalog item.

Leather key charms in the shape of lettersYour shape

From artwork to product

Five steps, and what you approve at each

You see a review before paying for anything, a drawing before the tool is cut and a first piece before the run starts. Day counts are sample data.

  1. Step 1

    Artwork review

    We check line weights, undercuts and color separations, and tell you what will not work before you pay for anything.

    Day 1 to 2
  2. Step 2

    Mold drawing

    A dimensioned drawing with colors and metal or parting lines, for your written approval.

    Day 2 to 4You approve
  3. Step 3

    Tooling

    The mold is cut. You own the design; the tool is held for your reorders.

    Day 4 to 10
  4. Step 4

    First article

    The first pieces from the tool, photographed and couriered for approval.

    Day 10 to 14You approve
  5. Step 5

    Production

    The approved first article is the reference for the whole run.

    From day 14

What we need

Three things to get a useful answer

Send what you have. Anything missing can be “not sure yet”.

Design

A drawing, a sketch or a reference

Vector artwork for flat shapes. For anything three-dimensional, a sketch with sizes or a reference product.

Use

What it is for, and how big

Who receives it and how it is used decides material, thickness and attachment.

Quantity

Quantity and a date

Tooling is a one-time cost spread over the run, so quantity changes the answer more than anything else.

Before you ask for a quote

What the quote confirms

These depend on the product, the quantity and the date, so they are settled per project and written into your quote.

Minimum order
Depends on the process. Sample data: from 100 units for die-struck metal to 3,000 for some molded parts.
Tooling cost
Quoted once per design, before any work starts. The tool is kept for reorders.
Added time
Sample data: 7 to 20 days before production, depending on the tool.
Feasibility
The artwork review says what can and cannot be made as drawn. Nothing is confirmed before that review.

Start a project

Tell us what you want to change.

Send what you have: a logo, a color reference, a sketch or a product link. We reply with what is possible at your quantity and date.